Ä¢¹½´«Ã½

This content was published: January 8, 2015. Phone numbers, email addresses, and other information may have changed.

Cascade Campus celebrates new academic buildings with public open house

Story by

The 49,000-square-foot Cascade Hall features faculty workspace and 14 general-purpose classrooms.

The 49,000-square-foot Cascade Hall features faculty workspace and 14 general-purpose classrooms.

Ä¢¹½´«Ã½ is hosting an open house to celebrate its two newest buildings at the Cascade Campus (705 N. Killingsworth St.).

“New Beginningsâ€� runs from 2-6 p.m. on Tuesday, Jan. 20 and includes tours of both the new Student Union and Cascade Hall at Ä¢¹½´«Ã½ Cascade. The program – to take place in the student lounge on second floor of the Student Union – begins at 4:30 p.m. and will include comments from College President Jeremy Brown, Cascade President Karin Edwards, students, faculty, the Ä¢¹½´«Ã½ Board of Directors and local legislators. Food, music, and a light show will be offered, as well. The open house is free and open to the public.

Both buildings are part of the college’s 2008 voter-approved $374 million bond program with $58 million going to the construction and improvements at Cascade.

The Buildings:

Cascade Hall – This is the new academic building, which opened last fall. The 49,000-square-foot facility features faculty workspace and 14 general-purpose classrooms. The Center for Careers in Education and the Portland Teachers Program are housed there, as well as the new childcare center. Ä¢¹½´«Ã½ received an $8 million matching grant from Oregon’s Community Colleges Workforce Development Department for this building.

The 36,000-square-foot Student Union replaces the outdated, 1970s-era Student Center.

The 36,000-square-foot Student Union replaces the outdated, 1970s-era Student Center.

Student Union – The 36,000-square-foot building replaces the outdated, 1970s-era Student Center. Amenities include food service and dining areas, student clubs and government offices, a study/lounge area, flexible meeting space, Women’s Resource Center, Multicultural Center and the International Education Program offices.

The area between the two new buildings is a landscaped plaza that will be part of an east-west “mallâ€� running through the entire campus once construction is complete. Below the plaza and the two buildings is an underground parking garage that opened this past September. The 211-space garage is the first of its kind to be built on any Ä¢¹½´«Ã½ campus. Its design was part of the college’s commitment to the neighbors and the City of Portland to reduce the number of college-related vehicles parking on local streets.

Ä¢¹½´«Ã½ James Hill

James G. Hill, an award-winning journalist and public relations writer, is the Director of Public Relations at Ä¢¹½´«Ã½. A graduate of Portland State University, James has worked as a section editor for the Newberg Graphic... more »

Poppie with speech bubble

Comments

Sorry, but the comments have been closed. If you see something that doesn't belong, please click the x and report it.

x 19605 by c. louis butts, jr., 1 decade ago

will there be shuttles to the new Tech jobs;fiber optics,hvac,nec training,etc.,@the Ä¢¹½´«Ã½ center down on Swan Island industrial area?!,…money’s tight enough for all of us students&to ask us to pay bus fares to courses/classes that were free on Ä¢¹½´«Ã½CAS campus seems a bit much(sfter all the charter’s ‘to be in service to students&community’…